Search
×

Thousands of Test to Create a Boutique

Explosion Proof Light Fixture Research and Development, Our Core Competency!


Up to ten procedures to develop a new product costing more than one year with the most advance technology to match updated products market trends

Contact us

For purpose of offering lighting products to withstand the most harshest and hazardous environment, SUREALL research and development team personally visit the real project place to get to know the overall operating process and conditions and dig out the precise installation difficulties deeply to design the accurate products to meet the market needs, with over 50 patents after cooperation with explosion proof research institute and oil and gas association, we make large  economic investment to do thousands of tests to create artistic works adhering craftsmanship spirit.

Market Needs Collection
Market Needs Collection

All products should be designed and structured close to actual market needs which may solve the real problems and overcome the practical difficulties.

Structure and Drawing Design
Structure and Drawing Design

Engineers need to transfer the virtual ideas and proposals to visual plane and three-dimensional drawing to show the feasibility.

Customers Feedbacks
Customers Feedbacks

Engineers focus on all their wisdom and know-how to conclude a product, but customers will analyze the products in usage aspects for more detailed feedbacks.

Molding and Sampling
Molding and Sampling

New mold should be opened subject to the designed drawings and an imaginary sample might be possible to present to us along with matched electrical components.

Test Verification
Test Verification

Rough sample need to be verified by various electrical and mechanical tests to review whether the ideal products can meet the design standard.

Sample Improvement
Sample Improvement

Sample might be adjusted for parts of structures, components and electrical parameters after review for customers feedbacks to finalize the improvement.

Test Confirmation
Test Confirmation

Second time test to check whether all improved parameters have been satisfied strictly and make the final test report datasheets for looking for.

Design Finalization
Design Finalization

Engineer collect and finalize all initial and updated designed shape and structure to finish the full set of design drawing, datasheet, test reports.

Certificates Application
Certificates Application

Based on the new launched products, international certificate including ATEX, IECEx and UL certificates will be started the relative process to verify the the performance by the third party.

New Product Launch
New Product Launch

With prepared products catalogue and certificate, we might launch new products through uploading to the internet, introducing to customers.

Lighting The Way To Safety! Choose SUREALL, Sure For All!

Want to Get High-quality LED lighting, explosion proof lighting and other explosion-proof fittings? Welcome to SUREALL

SUREALL Latest News & Blog